Re: Looking for L4 switch-off info

From: Joseph Mack (mack.joseph@epa.gov)
Date: Thu Apr 12 2001 - 05:13:01 MDT


Alex Rousskov wrote:
 
> Preliminary workloads for the switch-off will be available much
> earlier than 3 weeks before the event, probably this month as
> Polygraph version 2.6.0 is finally released.

What OS/version will the servers be running and approx what
hardware will they be running on
eg

MHz within 25%,
CPU type eg Intel family/Alpha...,
number CPUs,
network interfaces (number pointing to L4 switch, type eg 100Mb, 1Gb)

I may as well test here against something similar to
the real test.

thanks

Joe

-- 
Joseph Mack PhD, Senior Systems Engineer, Lockheed Martin
contractor to the National Environmental Supercomputer Center, 
mailto:mack.joseph@epa.gov ph# 919-541-0007, RTP, NC, USA



This archive was generated by hypermail 2b29 : Tue Jul 10 2001 - 12:00:18 MDT