I have 2 log file I need to combine into one report. The problem is that the
results log were generated from 2 pairs of poly client/server machines that
had different time and date on them. The results is untrustworthy plotting.
Is there a way to sync the time on the 2 log files?
Eli
This archive was generated by hypermail 2b29 : Tue Jul 10 2001 - 12:00:12 MDT